Conducting the Pre-ICO  2 июл. 2018  | 
Conducting the ICO  3 сент. 2018  | 
Construction of infrastructure  4 окт. 2018  | 
Stripping work  8 февр. 2019  | 
Start the program for redemption of tokens  12 июн. 2019  | 
Start of the development of other strip mine  8 июл. 2019  | 
Start of the development of the second strip  16 июл. 2020  |